Anchor | ||||
---|---|---|---|---|
|
Anchor | ||||
---|---|---|---|---|
|
Anchor | ||||
---|---|---|---|---|
|
PMP-87292 BI - As an end user i want to have a Task Description field in Sample Detail Screen
Anchor | ||||
---|---|---|---|---|
|
Included Surface Sampled Description and Area Description fields under Equipment Details in Sample Equipment.
Industrial Hygiene Package (Dynamic) >> Planned Sample >> Sample Equipment >> Equipment Details
...
Anchor | ||||
---|---|---|---|---|
|
Included Task Description field under Location Information in Sample Information.
Industrial Hygiene Package (Dynamic) >> Planned Sample >> Sample Details >> Sample Information >> Location Information
...
Anchor | ||||
---|---|---|---|---|
|
Now we have renamed the value Contractor to Contractor / Consultant / Rental for the Monitoring Equipment Owned By field.
Industrial Hygiene Package (Dynamic) >> Planned Sample >> Sample Equipment >> Sample Equipment Information
...
Anchor | ||||
---|---|---|---|---|
|
PMP-79867 BI - Assigning Multiple Plans to a Training Session
Anchor | ||||
---|---|---|---|---|
|
...
Learning Management Package (Dynamic) >> Session >> Course Assignment Details >> Plan Details
...
Included Plan in the Outcome Details Report in the LMS Reports (Report Central)
...
Anchor | ||||
---|---|---|---|---|
|
PMP-90465 BI -Renaming Sample ID for Drug test Encounter type screen
Anchor | ||||
---|---|---|---|---|
|
Drug Sample ID, Internal ID and Samples Sequence are the new fields that included under Drug Testing Details
...
in Details - Drug Test in Drug Test.
Occupational Health Package (Dynamic) >> Encounter Information >> Drug Test >> Drug Testing Details
...
Anchor | ||||
---|---|---|---|---|
|
Anchor | ||||
---|---|---|---|---|
|
Now we are fetching the Action Item information from the application table instead of Mongo reference tables, with this change we can achieve data integrity as there won’t be any data sync issues and earlier we used to join the action items with app data over the Form ID and the Parent Uid at report level, with this change we don’t need to do any additional work at report end.
...