PMP-37410          Technological changes to tree control in enterprise and location setup                                                                  

Hotfix Releases

PMP-42576

...

- Import tool for adding organization components in the Setup

Anchor
PMP-39507
PMP-39507
 

...

In the enhanced state, technological changes were done to improve the load performance of the pages. There is no change to the functionality of these pages.


Back to top


Anchor
PMP-42576
PMP-42576
 

PMP-42576 - Import tool for adding organization components in the Setup

In the enhanced state, the user would be able to import organization components across locations. This would be not be a real-time import but a scheduled activity and will be done every 24 hours. 

Organization Component import template


Location Code
Parent Department Name

Parent Department Hierarchy

(Level 0/Level1… /Level N)
Optional column

Department Name
Department Type
Description
Westlake"Blank""Blank"Power HouseDischarge PointThis department is the top node and so there is no parent department name. 
Sunrise2409-Production"Blank"StampingZone/ETU
"Blank"EngineeringManufacturingUnit1 / Production / Assembly Production ControlDepartmentThis department will be added to all locations as there is no location specified in the location code column. 