...
PMP-37410 Technological changes to tree control in enterprise and location setup
Hotfix Releases
...
- Import tool for adding organization components in the Setup
Anchor | ||||
---|---|---|---|---|
|
...
In the enhanced state, technological changes were done to improve the load performance of the pages. There is no change to the functionality of these pages.
Anchor | ||||
---|---|---|---|---|
|
PMP-42576 - Import tool for adding organization components in the Setup
In the enhanced state, the user would be able to import organization components across locations. This would be not be a real-time import but a scheduled activity and will be done every 24 hours.
Organization Component import template
Location Code | Parent Department Name | Parent Department Hierarchy (Level 0/Level1… /Level N) | Department Name | Department Type | Description |
---|---|---|---|---|---|
Westlake | "Blank" | "Blank" | Power House | Discharge Point | This department is the top node and so there is no parent department name. |
Sunrise | 2409-Production | "Blank" | Stamping | Zone/ETU | |
"Blank" | Engineering | ManufacturingUnit1 / Production / Assembly | Production Control | Department | This department will be added to all locations as there is no location specified in the location code column. |
Import Menu Navigation:
Import History: