Skip to end of banner
Go to start of banner

Risk Assessment

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Version History

« Previous Version 7 Next »


(blue star) User Story

As a HSE Member I would like to tracks all the tasks and evaluate their hazard risks individually.

👥 What am I doing now ?

I would have to maintain all my tasks and its associated hazard risk assessment in spreadsheet.

📖 App Capabilities

  1. Create a corporate library comprising of all Tasks and its associated Hazards/Risks and import that to locations.

  2. Ability to record both initial and final hazard risk assessment for all tasks

  3. Approval Workflows for reviewing & approving risk assessments

  4. Imports bulk tasks in assessments and conduct risk assessments

  5. Ability to track Administrative,

  6. Create action plans for risks and assign owners to mitigate the risk

🤩 Niche Features

  1. Ability to copy entire risk assessments from library with few clicks

  2. Generate JSA reports for all assessments

🚶‍♂️ Walkthroughs:

 Basic Walkthrough

Conducting Initial Risk Assessment for Hazard of Task

  1. Once you login to the system, click on the risk assessment icon

  2. Click on the assessment where you need to save tasks, identify hazards associated with these tasks and do risk assessment.

  3. System would land you on to the tasks/hazard list screen of the assessment.

  4. Click on “New” button to create new sub-tasks associated with the assessment

  5. Fill out the task details and hazard(s) associated with the task and save it.

  6. Now, the sub task is saved, click on the Hazard Link to conduct the risk assessment and click on “Add” on hazard screen

  7. Answer the risk assessment metrics fields such as Severity and Likelihood

  8. Based on the selections in above step, system will calculate the risk score and will ask whether you need to place controls (Administrative or PPE) to eliminate or minimize the risk.

  9. We can also create action items in the same page

  10. Once all required fields are filled, save it.

Conducting Final Risk Assessment for Hazard of Task

  1. Once the initial risk rating is saved, you can open the same hazard to record the final risk assessment.

  2. Click on add button, system would open up the form with existing risk assessment filled in.

  3. Update the fields such that they reflect the final risk rating after placing controls and save it.

  4. You can do the above steps multiple times until you have final risk assessment.

Approving Assessments

  1. Based on your organization’s approval policy, your approval process may vary. But doing approvals is easy as you would be alerted about the assessment which you need to approve.

  2. Once you click on the link in the email notification received on approval, you would be redirected to the page where you could approve or commit a step for assessment approval.

  3. Click on “New” to open up the screen where you can approve or complete one step in approval process.

  4. Use the status field to provide your decision and save it

 Advanced Walkthrough

Setting up an Assessment

  1. Once you login to the system, click on the risk assessment icon

  2. Click on “New” button to create new Assessments

  3. Fill out the form and select “Next” button to move to approval section.

  4. Select the approval workflow you would want to have for this assessment and fill out the select the approvers, reviewers etc.

  5. You can move on to the next step of setting up Notification by clicking on the notification setup tab.

  6. You can set Alerts or Reminders for different events in lifecycle of this assessment, the functionality is similar to Calendar’s notification setup

  7. You have now completed setting up the assessment, you can move on to next steps of identifying Tasks/Hazards or go back to list screen.

🔩 Field Details and Configurability

Screen

Section

Field Order

Field Name

Description

Field Type

Configurable

Assessment Setup

General Detail

 

 

 

 

 

1

ID

Internal system generated ID unique for each risk assessment

Text Box

1.Show/Hide-N/A

  1. Mandatory/Optional-N/A

  2. Default Value-N/A

  3. Generate JSA ID Prefix

2

Associated Number/Risk Assessment Number

Free Text field for entering any reference for the risk assessment

Text Box

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

3

Title

Short description of the Risk Assessment

Text Box

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

4

Assessment Date

Date of the Risk Assessment

Date Picker

1.Show/Hide-Supported

  1. Mandatory/Optional-N/A

  2. Default Value-N/A

5

Assessed By

Name of the user who has assessed the Risk Assessment

Pick List

1.Show/Hide-Supported

  1. Mandatory/Optional-N/A

  2. Default Value-N/A

6

RA Conducted in Consultation with

Information of Organization/Person in consultation with who the RA is conducted

Text Box

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

Location Information

 

 

 

 

 

 

7

Location

Location of the Risk Assessment

Text Box

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

 

8

Job/Similar Exposure Group

Job/ Similar Exposure Group associated with Risk Assessment 

Pick List

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

 

9

Department

Department of the Risk Assessment

Pick List

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

 

10

Work Area

Work Area associated with Risk Assessment

Pick List

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

 

11

Building

Building where the Risk Assessment is performed

Pick List

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

  3. ShowBuildingPickList-Yes/No; Default=Yes

 

12

Task

Task associated with Risk Assessment

Pick List

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

 

13

Job Classification

Job Classification/ Title associated with Risk Assessment

Pick List

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

 

14

Work Shift

Work Shift associated with Risk Assessment

Dropdown

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

 

15

Job Occurrence

Select the occurrence of job

Drop Down

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

 

16

Division

Alows the users to enter the division

Text Box

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

Assessment Details

 

 

 

 

 

 

17

Type

The Type of Risk Assessment being performed

Drop Down

  1. Show/Hide-Supported

  2. Mandatory/Optional-Supported

  3. Default Value-N/A

  4. Supports Dependency

  5. Supports Formula Configuration by Type

 

18

Assessment Subtype

Assessment subtype which is not dependent on Type

Drop Down

  1. Supports Mandatory/ Optional               

  2. Supports Show/Hide

 

19

Assessment Category

Allows users to select the assessment category

Drop Down

1.Show/Hide-Supported

 

20

JSA Priority

Denotes the priority of the Risk Assessment 

Drop Down

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

 

21

Description (Maximum 2000 characters)

Actual description of the Risk Assessment

Text Area

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

 

22

Machine/Process Name

If Type = Machine, provide the Machine/Process Name

Pick List

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A           4.Show/Hide PickList-Supported

 

23

Serial Number

Machine/Process Serial Number

Text Box

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

 

24

Year of Manufacture

Year of Manufacture of Machine/Process

Text Box

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

 

25

Is Machine CE Marked

To identify Machine CE Marked

Radio Button

1.Show/Hide-Supported

  1. Mandatory/Optional-N/A

  2. Default Value-Supported

 

26

CE Certificate Comments

Captures CE certificate comments information

Text Box

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

 

27

What Assessment Type was performed?

Captures performed assessment type information

Text Box

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

 

28

Has an ergonomic assessment been performed? 

Specifies ergonomic assessment performed Yes/No/NA.

Radio Button

1.Show/Hide-Supported

  1. Mandatory/Optional-N/A

  2. Default Value-Supported

 

29

Why is the assessment being performed? (Do not include names)

Captures the reason why the assessment being performed

Text Box

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

 

30

Chemicals Involved

The Chemicals involved in the Risk Assessment

Pick List

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

  3. DisplayCorporateChemical- Default Value:No

 

31

Required Training

Specifies whether training is required 

Text Area

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

 

32

Administrative/Procedural

Specifies Administrative/Procedural Controls

Pick List

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

 

33

Required PPE

Specifies whether PPE is required as part of control

Pick List

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

 

34

Comments & Reference Documents

Any comments or reference w.r.t to Risk Assessment

Text Box

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

 

35

Approval workflow

Allows users to select the approval workflow

dropdown

No configuration

 

36

Reviewer 

allows users to select the reviewers

Pick List

No configuration

 

37

Approval due date

Allows defining the due date for review

Numerical text box

No configuration

 

38

Approver

allows selection of the approver

Pick List

No configuration

 

39

Approval due date

allows defining the due date of approver

Numerical text box

No configuration

Assessment Status

 

 

 

 

 

 

40

Add to Corporate Library

Add Risk Assessment to Corporate Library View

radio button

1.Show/Hide-Supported

  1. Mandatory/Optional-N/A

  2. Default Value-N/A

 

41

Select Assessment Version

Allows users to select the assessment version

Drop Down

1.Show/Hide-Supported

  1. Mandatory/Optional-N/A 

 

42

Current Version

 

 

 

 

43

Next Assessment Date

Date of next Risk Assessment

Date Picker

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

 

44

Status

Status of the Risk Assessment

Drop Down

1.Show/Hide-Supported

  1. Mandatory/Optional-N/A

  2. Default Value-N/A

Tasks/Hazards

Tasks

 

 

 

 

 

Add

1

Task/Activity Title

Short Description of the Task/Activity

Text Box

 

2

Task/Activity Description(Maximum 2000 characters)

Description of the Task/Activity

Text Area

 

 

Task/Activity Category

Shows all Categories identified in module setup

Auto Complete

  1. Supports Show/Hide

  2. Supports Mandatory/Optional

3

Hazards

Hazards identified during the Risk Assessment

Pick List

1.Show/Hide-Supported

  1. Mandatory/Optional-Supported

  2. Default Value-N/A

 

Are new controls required for this task

Allows users to select if new controls are required

Drop Down

 

4

Status

Status of the Task/Activity

Drop Down

 

Hazard

 

 

 

 

 

Task Title

1

Hazard 

Hazard Identified

Pick List

 

2

Hazard Definition

Shows Hazard definition provided in Hazard look-up value

Text Area

  1. Supports Show/Hide

3

Hazard Category

Define hazard categories

Auto Complete

  1. Supports Show/Hide

  2. Supports Mandatory/Optional

4

At Risk

 

Auto Complete

Show /Hide-Supported

5

Hazard Details

Details of the Hazard identified

Text Area

  1. Supports Show/Hide

  2. Supports Mandatory/Optional

6

Probable Consequences

Define all the consequences

Auto Complete

  1. Supports Show/Hide

  2. Supports Mandatory/Optional

7

Type of Employee exposed

Identify Type of Employees exposed to the Hazard

Auto Complete

  1. Supports Show/Hide

  2. Supports Mandatory/Optional

8

Number of Employees

 

Text Box

  1. Supports Show/Hide

  2. Supports Mandatory/Optional

9

Attachment

 

Attachment

 

Hazard Ratings

 

 

 

 

 

Risk Rating

1

Hazard

 

 

 

2

Hazard Rating Date

Date when the Hazard was rated

Date Picker

 

3

Frequency of Task/Activity 

The frequency in which the Task/Activity is performed

Drop Down

  1. Supports Show/Hide

4

Likelihood

How likely does the Task occur

Drop Down

  1. Supports Show/Hide

5

Severity / Degree of Possible Harm (Consequences) 

The degree of possible harm expected

Drop Down

  1. Supports Show/Hide

6

Extent of Injury

 

Drop Down

  1. Supports Show/Hide

7

Property Damage

 

Drop Down

  1. Supports Show/Hide

8

Controls

 

Drop Down

  1. Supports Show/Hide

9

Fire Load

 

Drop Down

  1. Supports Show/Hide

10

Exposure Frequency

 

Drop Down

  1. Supports Show/Hide

11

Likelihood of Occurrence

 

Drop Down

  1. Supports Show/Hide

12

Risk Factor

 

Text Box

  1. Supports Show/Hide

13

Risk Rating Score

Score provided to the Risk Rating

Text Box

 

14

Risk Level

Level of Risk identified

Text Box

 

Controls

1

Are there existing Controls? 

Are there existing controls based on risks identified

Drop Down

 

2

Can the Hazard be eliminated?

whether the hazard can be totally eliminated using controls?

Drop Down

 

3

Administrative/Procedural

Administrative/Procedural Control

Pick List

  1. Supports Show/Hide

4

Engineering 

Engineering Control

Pick List

 

5

Personal Protection Equipment 

Personal Protection Equipment Control

Pick List

  1. Supports Show/Hide

6

Substitution

Free text field allowing users to enter substitution control

Text Area

Yes

7

Elimination

Free text field allowing users to capture the Elimination controls

Text Area

Yes

8

Training Requirements

Training requirements needs

Text Box

 

9

Are Existing controls Adequate?

whether the controls mentioned are adequate for the Hazard?

Drop Down

 

 

10

Do you propose new controls?

Make it Read Only and default to yes

 

  1. Supports Readonly Default

 

11

Administrative/Procedural

Administrative/Procedural Control

Pick List

  1. Supports Show/Hide

 

12

Engineering 

Engineering Control

Pick List

 

 

13

Personal Protection Equipment 

Personal Protection Equipment Control

Pick List

  1. Supports Show/Hide

 

14

Training Requirements

Training requirements needs

Text Box

 

 

15

Action to reduce risk

 

Text Box

 

Notes/Comments

 

 

 

 

 

 

16

Notes/Comments

Any notes/comments on the Risk Assessment

Text Area

 

Action Item Details

 

 

 

 

17

Add Action Item 

 

Radio Button

No

Source Details

1

Source ID

Displays Source information

Non editable field

 

2

Source Title

Displays Source Title

Non editable field

 

Create

3

Action Item Title

Captures the name of the Action Items

Text Box

No

4

Action Item Category

Specifies module name

Non editable field

No

5

Action Item Type

Specifies Corrective Action or Preventative Action 

Dropdown

No

6

Action Item Description 

Short description of the Action Item

Text Area

No

7

Action Item Priority

Specifies Action Item Priority

Dropdown

No

8

Action Item Due Date 

Due date by which the action item should be completed

Date Picker

Configurable to set the No.of Dates as due date

9

Owners 

Person primarily responsible for completing the action items

Picklist

No

10

Notify Owners Immediately

Option to provide an immediate email notification about the Action Item

Checkbox

 

 

Departement

Select Department

Dropdown

 

11

Assigned By

The person responsible for assigning the Action Item

Picklist

 

 

Verification Required

Allows users to check whether cerification is required for the action item

Checkbox

 

Alert/Reminder

1

Type

Allows users to select whether it is alert or reminder

Dropdown

 

2

Notification

Alllows users to select whether the notification is to be sent to Email Portal or Email and Portal both

Dropdown

 

3

First Alert Date/First Reminder Date

Allows users to select the first alerts Date

Text Box & Dropdown

 

4

Notify Every

Allows users to select the frequency of the alert/Reminder

Text Box & Dropdown

 

5

Include Owner(s) and Assigned By

Allows users to select whether Owners and Assigners are to receive the Alerts/reminder

CheckBox

 

6

Notify Users

Allowss users to select additional User

Picklist

 

7

Notify Others

Allows users to select additional people to receive the alert/Reminder

Text Area

 

Complete

12

Action Item Status 

Captures the current status of the action item

Dropdown

No

13

Action Taken 

Short description of the actions taken to complete this action item

Text Area

No

14

Action Item Completed By 

Person who completes the action item

Picklist

No

15

Action Item Completion Date 

Date on which the action item was completed

Date Picker

No

Cost Information

16

Capital Expenditure Involved

While completion of the action items if some capital expenditure was incurred or not

Radio Button

No

17

Approximate Cost 

Approximate cost incurred for completion of this action item is captured here

Text Box

No

Attachments

18

Upload Attachments

Browse to attach documents

Text Box

No

  • No labels