New and Improved Features
PMP-4169- Auto-generated Sequence ID for "Task" from Task management and Library
- PMP-49024- Have an option in the task details screen to link a DAP form
- PMP-47005- Configuration to Make "Action item description” a mandatory field in Task detail
- PMP-47004- Expand the "Text Area" size for "Action Item Description and Action Taken" fields
- PMP-47073- Add uploaded by information in attachment section of Action Item details
- PMP-48234- Automatically assign location scope to parent "Calendar category and Action Item Driver" when scope to extra location is assigned to a child
PMP-4169- Auto-generated Sequence ID for "Task" from Task management and Library
Configuration Setting: No configuration .Product wide change
Existing System:
- Currently there is no unique identifier for the Tasks created from Task Management and Task Library. The action item created from task in calendar doesn't have a source ID as well.
Purpose : The current system captures the details of a task but there is no unique identifier for task and action items created from task management and library. The user can only identify a task and dependent action item by it’s title
Enhanced System: In the enhanced system, Task will have an Auto-generated Sequence ID in the following format-
- "CT-SequenceCounter" for the tasks created from Task Library
- "CountryCode-LocationCode-CT-SequenceCounter" for task created from Task Management
Source ID for task created from Task Library and pushed to Task Management and Action Items from Task Management
- This section will have only one field named as "Source ID"
- Auto-populate this field with Task ID of parent Task
PMP-49024- Have an option in the task details screen to link a DAP form
Configuration Setting: Show/ Hide, Public
Default : Hide,Customer Specific
Existing System:
- Currently there is no option to link a Task from a DAP form
Purpose : For some Task user needs to fill a form based on the details of Task. Currently that linkage option is missing.
Enhanced System:
- Added a new field "Module Reference" to Task and Action Item detail.
- It will be a composite control having below fields
- Module dropdown containing the values "App Builder" or any other module which task is integrated with (For now, Either "App Builder" or "None" and default value will be "App Builder").
- Auto Complete control where list of Forms will be populated. (In case the user has selected "None" for Module Reference field then search will be disabled)
- In action Item details the field will be read only with a clickable link which will redirect the user to form
- Introduced a configuration to turn on/off the field in the task details
PMP-47005- Configuration to Make "Action item description” a mandatory field in Task detail
Configuration Setting: Mandatory/ Non-Mandatory .Public
Existing System:
- Currently the action item description field is non- mandatory and there is no option to make this field mandatory
Purpose :
Enhanced System:
PMP-47004- Expand the "Text Area" size for "Action Item Description and Action Taken" fields
Configuration Setting: No configuration .Product wide change
Existing System:
- T
Purpose :
Enhanced System:
- Introduced a Mandatory/Non-Mandatory configuration for "Action Item description" field for tasks from Task Library and Task Management
PMP-47073- Add uploaded by information in attachment section of Action Item details
Configuration Setting: No configuration .Product wide change
Existing System:
Purpose :
Enhanced System:
PMP-48234- Automatically assign location scope to parent "Calendar category and Action Item Driver" when scope to extra location is assigned to a child
Configuration Setting: No configuration .Product wide change
Existing System:
- T
Purpose :
Enhanced System: