![image2017-8-30_10-13-5.png](https://processmap.atlassian.net/wiki/plugins/servlet/confluence/placeholder/unknown-attachment?locale=en_GB&version=2)
...
New Root Cause Workflow for Findings – PMP-4274
...
- If an audit program start date is updated from the Audit Set Up page then correspondingly the audit start date will also be updated. However, if the audit start date is updated in the program status tab for a particular location, then on subsequent updation of the Program Start Date, the Audit start date will not be updated.
- New Columns of Location Program Start Date and Location Program End Date has been also introduced to differentiate between the program dates and location audit dates. These columns will be non-default and non-mandatory in the SOA Select Columns screen.
![](https://processmap.atlassian.net/wiki/download/thumbnails/104792540/image2017-9-12_12-28-17.png?version=1&modificationDate=1505233702327&cacheVersion=1&api=v2&width=600)
- Display the Program Start date only in the details page.
Image Modified
- Users can change the start date in the Audit Setup
Image Added
Back to Top
Field level permissions for findings closure – PMP-30391The application has been enhanced to allow administrators to restrict the ability to change the finding status and limit the ability to change any other details related to the finding.
Image Added
Back to Top
Upgrade audit report with details of Finding Description – PMP-11297The Audit Details report has been enhanced to include the finding description details. The following columns will be added to the Audit Report:
- Finding Title
- Finding Details
- Finding Root Cause
Image Added
Back to Top
Track closure of findings with respect to finding significance level – PMP-11226The application has been enhanced to provide the ability to define the significance level of audit findings.
Previous State:
- The system provided the ability to categorize the audit findings based on finding type but not on finding significance level
- Finding significance level denotes the severity of the finding .As such, categorizing the finding based on significance level can help in determining the measures for the findings as well as their closure due dates
For example : Finding with higher significance level can be set for closure on a nearer date with respect to the finding reported date as compared to a finding with lower significance level
Enhanced State:
- Introduced the Finding Significance Level drop down in the Finding Type page in Module Setup
...
Image Added
- Based on the finding significance level defined in the finding type ,once the user selects the finding type in the finding creation page, the finding significance level will be auto populated.
- Finding significance level can also be changed in the finding creation page, even though it is an auto populated field.
- Users can pull the list of findings based on the finding significance levels.
Image Added
Back to Top