Skip to end of banner
Go to start of banner

22.2 Performance Management Release Notes

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Version History

« Previous Version 4 Next »

New and Improved Features

Product Level Change

Configurable

  • No Items

PMP-86033 As a system admin I want Copy program feature for ease of setting up programs for next year

Configurable: No

  • Title: NA
  • Public/Private: NA
  • Default: NA

Existing System

  • As of now system does not have option to copy Sustainability Programs
  • As a result Administrators has to go through all the steps of Program creation every year
  • This increases chances of missed configurations as there are many steps involved

Purpose: 

  • Reduce redundant yearly activity by providing copy program feature
  • Reduce dependency on ProcessMAP support

Enhanced System:

  • Has option to copy a Sustainability Program
  • User has to select program to to be copied and click on Copy button
  • System will open Program details page and populate all the fields from source program except for Dates
    • Program name will be prefixed with "Copy of" 
  • Once user updates the dates and save, all other tab configurations will be copied over to the new programs as per provided start and end dates
  • Reporting Frequency start and end date will be set same as Program start and end date

Impacts: No Impact


Back to top

PMP-85713 As a system admin I want an option to recalculate existing KPI data after formula update

Configurable: No

  • Title: NA
  • Public/Private: NA
  • Default: NA

Existing System

  • Does not have option for System Administrators to recalculate the data in case formula is change for a KPI
  • They need to depend on ProcessMAP support to recalculate the data

Purpose: 

  • Provide option for System Admin to change the formula and correct existing data for the KPI without dependency on ProcessMAP support

Enhanced System:

  • Has option to recalculate data for existing KPI when formula is changed
    • The recalculation option will be visible for existing KPIs where:
      • Derivative KPI is configured to a Program i.e. reporting frequency is configured
      • Historical data is available
      • There is a change in the formula or it is new KPI
    • The recalculation option will be visible for New KPIs where:
      • Derivative KPI is configured to a Program i.e. reporting frequency is configured
    • System also provides option for user to choose the period for which the new formula should be applied on existing data
    • The options are Current Year, Last 2 Years, Last 3 Years
    • Customer using Fiscal Year configuration these options will be displayed accordingly the period will be considered as per configuration
    • If the KPI is Energy KPI then Emission Data based on KPI configuration will also be refreshed
    • During recalculation the button text will change to "Recalculation In Progress" and it will be disabled
    • The button will be visible until the recalculation has happened. Once recalculation is done the button will be hidden
    • If user does not make use of "Recalculate Existing Data" button after formula change, the new formula will apply moving forward only (existing behavior)
    • YTD will be calculated based on latest formula
  • System also has a new section called "Formula History"
    • The section will be available only for "Derivative from Other KPIs"
    • The section will display User Name and time stamp of the change
    • It will capture the change in Formula and recalculation

Impacts: No Impact


Back to top


  • No labels