18.3 HotFix Live Activity Management Release Notes
New and Improved Features
Product Level change
Configurable
- PMP-47100 As an end user would like to have 12 week CAPA verification process in Action Item
- PMP-56618 Action Item Expansion Functionality & EEM / EPM
PMP-48114 Add option to Track action items for each assigned owner individually
Configurable: No (Enable and Disable using Common Action Item Framework Configuration)
- Title: NA
- Public / Private: NA
- Default: NA
Existing System:
No option to create Action Item individually for each assigned owners.
Purpose:
Option to create Action Item individually for each assigned owners. This will help to create same Action Item for multiple owners at a time, rather creating multiple time for each owner.
Enhanced System:
- Provided an option to create Action Item individually for each assigned owners.
- The option will be default to uncheck. If user selects the option, after saving the option will be again unchecked.
- Action Item Create/Update and other mail will be sent individually to each owners.
Impacts: None
PMP-47100 As an end user would like to have 12 week CAPA verification process in Action Item
Configurable: No (Enable and Disable using Common Action Item Framework Configuration)
- Title: NA
- Public / Private: NA
- Default: NA
Existing System:
Doesn't have an option for 12 Week Action Item Verification
Purpose:
Limit the Closing of Completed Long Term Countermeasures until a period of 12 weeks from the date of the Completion has occurred.
Enhanced System:
- Verify Users should have the ability to Reject but not the ability to Close a Completed Long Term Countermeasure during the 12 week (84 days) time period following the Action Item Completed Date.
- Until the 12 week time period is met, Verify Users will only have the available values Open (default value) and Reject in the Verification Status field.
- Upon reaching the end of the 12 week time period from the Action Item Completed Date, the Verification Status field will have three available options for selection: Open (default value), Closed, and Reject.
- When a Long Term Countermeasure is rejected, the Action Item Status should not update to Open as found in the existing system.
- When a Long Term Countermeasure’s Verification Status is updated to Reject, the Action Item Status shall be automatically updated to Closed.
- For Long Term Countermeasures with Verification Required, the following notifications are required:
- An initial notification will be sent to Verify Users 84 days after the Action Item Completed Date for Long Term Countermeasures where the Verification Status is Open.
- Recurring notifications will then be sent to the Verify Users every 7 days after the initial notification until the Verification Status is updated to either Closed or Reject.
- The notifications will request the Verification to be completed and include a hyperlink to the Long Term Countermeasure.
Impacts: None
PMP-56618 Action Item Expansion Functionality & EEM / EPM
Configurable: No
- Title: NA
- Public / Private: NA
- Default: NA
Existing System:
Purpose:
Enhanced System:
- For a Long Term Countermeasure
- Provide field "Applicable to expansion?"
- If "Applicable to expansion?" is 'Yes' then ask to provide “Description of Actions to be Expanded”
- Provide field "Applicable to EEM/EPM info?"
- If Applicable to EEM/EPM info? is ‘Yes’ then ask to provide “EEM or EPM"
- If Applicable to EEM/EPM info? is ‘Yes’ then ask to provide “EEM/EPM info Submitted”
- If "EEM/EPM info Submitted" is ‘Yes’ then ask to provide “Document Number”
Impacts: Mobile, Feed, Cognos (v19.1)