/
23.1 Activity Management Notes

23.1 Activity Management Notes

`

New and Improved Features

Product Level Change

Configurable

PMP-85386 - Creation of Tasks for Multiple Locations via Task Management

Configurable: Yes

  • Title: Show Assign To Other Locations Information
  • Public/Private: Public
  • Default: Yes

Existing System

  • Only users with Corporate Task Administrator can create tasks for multiple locations.

Purpose: 

  • Provide the option for the division or site administrator to create tasks for multiple locations from the location Task Management 

Enhanced System:

  • Option to create tasks for multiple locations from the task management
  • This option will display only for new task creation
  • Display locations based on the login user / created by user's scoped location and permission to create the task
  • If a group has been selected for owner assignment, for other location(s) it will create the task for the group members having scope to other locations

Impacts: No Impact



Back to top

PMP-89682 - Copy Location - Add Calendar Categories

Configurable: No

  • Title: NA
  • Public/Private: NA
  • Default: NA

Existing System

  • No option to copy the calendar category along with the location copy

Purpose: 

  • Default or specific site related calendar categories can be copied along with the location

Enhanced System:

  • Provided the option to select calendar category in the location copy feature
  • Assign the location scope to the calendar category for the newly created location 

Impacts: No Impact


Back to top





Back to top

© 2018 ProcessMAP Corporation, All Rights Reserved Confidential, may not be disclosed without the express permission of ProcessMAP Corporation